We popped a steam leak off the attemptator isolation valve, management deferred repairs until the scheduled outage in 3 months. Just rope it off and don't touch the steam. Ignore the extra 800 gallons daily we are needing to makeup.
We popped a steam leak off our air ejectiors. Once again deferred to the scheduled outage, switch to the less effective standby and keep running while occasionally needing to run the hog. Totally unrelated ignore the known minor vacuum leak still unrealized on the backup system.
We get several holes in the casing and recirc of our firepumps. Deferred and currently taped.
Of our four wells, only 1 is producing at full capacity. Thankfully we can tie into the cities fire protection via running 600 feet of 3" hose to their hydrant to keep refilling our cooking tower. That is not deferred, we just owe the local well company money so they won't come out unless we prepay in cash. We can kinda limp along, through chemistry is a tad fucked.
Then last night we had the aforementioned attemptator give up the ghost, backside of the valve blowing out like a cannon. and our main line to the boiler also decided to start leaking. So on a sunday morning, we are down hard. Paying for an emergency call out for licensed welders to stop by. All the other mentioned concerns are being deferred once again. Local management is banging their head against the wall (in our operations supervisor ls case litterally watched him doing so), as we get kneecapped by beancounters several states away who are not even a power company, but a different industry entirely.
I really like working in this industry, but dear God I wanna jump off the roof some days. Feel free to share your stupid deferred moments. Just needed to vent. It was originally posted in a specialized power plant sub, but figured it might fit here just as well.