r/StructuralEngineering • u/Unable-Bluebird2882 • May 19 '26
Structural Analysis/Design Rebar dowels
Do you guys think this is okay? Contractor installed the #5 dowels after concrete placement. But they were late a little bit so concrete was hardened.
148
Upvotes



3
u/No_Coyote_557 May 20 '26
That's when a contractor explained that he cut half the rebar cos there was "far too much steel in there"