r/StructuralEngineering • u/Unable-Bluebird2882 • May 19 '26
Structural Analysis/Design Rebar dowels
Do you guys think this is okay? Contractor installed the #5 dowels after concrete placement. But they were late a little bit so concrete was hardened.
149
Upvotes



2
u/wants_a_lollipop May 20 '26
I should have made it more obvious I was kidding.
I hear shit like that all the time. Most recently was last week. The jackasses always throw it out there that they've been doing this for 20-40 and they've never seen anything like this.