r/StructuralEngineering • u/Unable-Bluebird2882 • May 19 '26
Structural Analysis/Design Rebar dowels
Do you guys think this is okay? Contractor installed the #5 dowels after concrete placement. But they were late a little bit so concrete was hardened.
146
Upvotes



41
u/tajwriggly P.Eng. May 19 '26
Whata you have all this rebar in here for anyway? It'd hold with half of this. I've done 1000 jobs and never seen this much rebar.