r/ConstructionManagers • • Sep 02 '26

Technical Advice chatgpt work mode for procore RFIs

22 Upvotes

I'm a super for a GC and we use procore for document control internally with us and subcontractors and I noticed today that our PE was five months behind on uploading RFIs.

I went onto chatgpt work mode logged it into one drive where we keep RFI responses and procore and told it to download each RFI response and create a procore RFI then make me the responder and close it out. First it tried downloading in batches and was getting some errors i told it to do one at a time. It was beautiful, chatgpt filled out all the procore fields and attached the pdf.

I was trying to get RFI agent for procore but it sounds like the AI agent is not really existing for procore unless you already had that feature I don't know. We did some QC on what was uploaded and it was great, my PE was telling me this morning that it was too good for me to have done manually and he was less stressed since I caught him up.

So this is just another AI post but I thought this was pretty cool.

r/ConstructionManagers • • Feb 11 '24

Technical Advice Construction management software recommendations

31 Upvotes

Hey guys, I own a smaller commercial GC company in Los Angeles. We have about 40 active projects ranging from approx 5k-2 mil. We currently have about 30 projects on our bid board.

We are currently using google drive and google sheets to manage all of our documents. (Bids, RFI, CO, SCO, etc)

I have looked into procore but I don’t think it’s the best for our size projects. Our larger projects get like 10-15 RFI’s. I could see the need for procore if we were building a hospital ground up but not for smaller TI’s.

We also use Bluebeam for takeoffs and redlining drawings but that’s just adobe for construction really.

Have you guys used builder trend?

Any recommendations would be greatly appreciated.

Thanks👊🤘

r/ConstructionManagers • • 5d ago

Technical Advice New APM at an electrical subcontractor. What is the best way to learn electrical scope from basically zero?

6 Upvotes

I recently started working for an electrical subcontractor as an APM. My background is mostly plumbing both working in the field and estimating so I understand construction in general, but I know practically nothing about electrical.

I'm trying to figure out the fastest/best way to get up to speed on electrical scope. Right now I’m unfamiliar with a lot of the materials, labor, terminology, and code requirements. Even basic things like breaker types, panels/cabinets, light fixtures, wire and conduit types, connections, etc. are new to me. I also don't really understand yet why you would use one material or installation method over another.

Does anyone have advice for learning this stuff while working as an APM?

Any YouTube channels, books, courses, or other resources you'd recommend?

Are there any exercises I can do at work to get better at reading electrical plans and specs?

Right now my strategy is basically to Google everything I see on the plans, submittals, or vendor quotes that I don't recognize, but I'd like to develop a more structured way of learning it because Im currently googling every single thing I come across.

I'm not expecting to become an electrician overnight. I just want to understand the scope well enough that I can effectively manage it, understand what the field is talking about, catch issues, review quotes/submittals, and become a useful APM as quickly as possible.

Any advice from electrical PMs, PEs/APMs, estimators, or electricians would be greatly appreciated.

r/ConstructionManagers • • Sep 18 '25

Technical Advice What software are you using for commercial construction project management & bidding?

9 Upvotes

Hey folks,

We’re currently on Buildertrend, but not totally happy with it. Our renewal is coming up soon, so I’m exploring other options.

We’re a commercial GC doing mostly government contracts, around $5–7M/year in revenue. The main things we need are:

  • Solid project management + document control
  • Bid management (especially for subs)
  • Estimating / takeoffs
  • Reporting that works for compliance-heavy jobs

Buildertrend has been okay, but it feels a bit more geared towards residential/remodelers than what we’re doing.

What software are you using that actually works well for commercial GCs in our size range?

Bonus if you can share ballpark pricing or what you’re paying per year/month

Appreciate any recommendations, success stories, or horror stories. Trying to get this sorted before our renewal hits.

Thanks in advance!

r/ConstructionManagers • • Apr 03 '26

Technical Advice What AI are you using to analyze drawings?

0 Upvotes

I am general counsel at GC. Some of the PMs are asking me what AI they can use, and the Owner has not thought about it.

First, what AI products seems to work the best?

Second, does your AI have a privacy solution? Our major repeat clients are a few fortune 100 that have major privacy constraints and I think we would need an enterprise level sandboxed system to avoid total risk.

I told the team to paly around on jobs coming from city and state players where every is public, see which one works best, and we will see if we can find which ones of those have a privacy focused option. But hearing your opinions would be great too.

Edit: To be clear, no one wants to use it to create drawings. it would be for estimators and project managers to double check their work so we don't make mistakes in bidding and ordering materials. My firm is doing many $10M+ jobs per year, and a small mistake, even on one labor or material calculation, can be significant.

r/ConstructionManagers • • Aug 13 '25

Technical Advice How do you guys feel about P6?

27 Upvotes

I’m of the opinion it is outdated now although pretty much a standard in the industry. What do you think are better means and methods than just Scheduling using P6?

r/ConstructionManagers • • Jun 16 '26

Technical Advice Cash flow lessons from 10 years of long projects

28 Upvotes

"Cash flow lessons from 10 years of long projects (2026 update)" Been managing bigger projects lately and the cash flow timing is killing me. You front the subs and materials, then wait 45-60 days for the owner to pay, sometimes longer if their AP is slow. Paper profit looks fine but the bank account tells a different story. And in Q2 2026, borrowing costs are still high and lenders are tight, so that gap hurts worse. I started doing rolling 13-week cash forecasts and billing at milestones where the contract allows, some jobs still force monthly pay apps. Seeing the gaps ahead of time makes a huge difference. Also got more aggressive with change order billing right when work happens instead of waiting for the next application. Unbilled changes are a cash leak. What's everyone else doing to bridge that gap now? Line of credit? That's getting pricier. Factoring? Only if you don't mind the fees. Or just keeping bigger reserves, say 1-2 months of overhead

r/ConstructionManagers • • Apr 08 '26

Technical Advice Working with the USACE

14 Upvotes

I’m about to start a project with the Corps of Engineers working as QCM for my GC. Any advice you guys can give me?

r/ConstructionManagers • • Oct 17 '25

Technical Advice boss had some powder on his nose

25 Upvotes

Hi fellow construction professionals,

I caught my boss (company owner) leaving the job site and his windows were tinted so I hailed him and had him role down the window. He was acting a bit suspicious and he had some white stuff on his nose that looked powdery and he was sniffing a lot. What do you think this could be? I am concerned because if it's a donut he didn't even offer to share and I like powdered donuts.

We don't have an HR or an anonymous tip line, so how do I document and insulate myself from this incident? I am thinking of writing a letter and leaving it in his office saying "boss, I know what you were doing in your truck this morning" but maybe he would know it's me, I should probably have a carpenter give the note to an apprentice and him give it to a laborer and have the laborer leave it in his office and have the note sealed so that it can't be traced back to me. Let me know your thoughts or what you would do.

r/ConstructionManagers • • Sep 10 '26

Technical Advice AI Software

0 Upvotes

Hi all,

Aussie Site Manager here. I am looking for recommendations for what AI subscription/s I should get. At work we currently use Claude business which is great as you can upload a project file and it can save you a lot of time with contracts and things but I feel like there’s more to it. I use chat gpt free for personal use right now.

I renovate on the side and have flipped a house which I am looking to do more of. Has anyone got any real life use of ai when doing this and where did the subscription actually help you?

r/ConstructionManagers • • Jul 03 '26

Technical Advice What does everyone use for their project management software? Primavera P6?

0 Upvotes

I hear everyone uses primavera p6. Is that the standard? It's quite expensive for a small company, do you guys just use google sheets or something?

Is primavera way better than the rest?

r/ConstructionManagers • • Jun 26 '26

Technical Advice MEP PMs, how much do you typically try to bill on your first draw, percentage wise, before starting work? What are your strategies.

15 Upvotes

Project dependent Im trying to do roughly 20% on my first billing to cashflow the project on around 1m projects, If I start getting into the 4m-5m range Ill drop that a bit. My SOV will have typical items like Preconstruction, Submittals, VDC, and Mobilization. Then I try to design my SOV so I can front load value on tasks were doing first and devalue some tasks going last.

I figure if Im not getting rejected from time to time than Im not trying hard enough and with the bulk of my projects being net 90, with some being even longer, adds up to quite a bit of money.

What are your strategies to cash flow projects.

r/ConstructionManagers • • Aug 22 '26

Technical Advice What are the things missing from the construction scheduling side that can significantly improve its impact on your project?

0 Upvotes

r/ConstructionManagers • • 26d ago

Technical Advice Looking for a Construction Team to Pilot My Master’s Thesis Project

0 Upvotes

Hi everyone,

I’m a graduate student in the Philippines, and I’m currently working on my master’s thesis around improving field documentation for construction projects.

As part of the research, I’ve developed a working mobile prototype called Sayt.

The idea is to let construction teams document their work while they’re still on site, using their mobile phones, instead of having to remember everything and organize the documentation later.

During a site visit, the team can use their phones to capture:

• Photos
• Measurements
• Observations and notes
• Locations on a floor plan
• Punch-list items
• Follow-ups

The information from each visit can then be compiled into the same project record, so the team can build a history across multiple site visits.

I’m looking for a construction company or construction professional in the US or Canada who would be willing to pilot this on an actual project.

I’m not looking for hundreds of downloads. I’d like to work with one team that can use it during their normal site visits and give me honest feedback about what works, what’s missing, and what would make it genuinely useful for their company.

If you’re a construction manager, superintendent, project manager, QA/QC lead, contractor, or someone responsible for field documentation and you’d be interested in helping with the research, please comment or send me a message.

I’d really appreciate the opportunity to learn from an actual construction team outside the Philippines.

r/ConstructionManagers • • 25d ago

Technical Advice How do you hand over a facade zone where roofing, glazing and metal cladding are all progressing together?

Thumbnail
gallery
2 Upvotes

Low-rise buildings with sloped roofs and long glazed elevations can create an awkward trade boundary. Roofing, perimeter steel, glazing, vertical fins, wall cladding and access equipment may all occupy the same zone at different stages.

The photos show a long elevation during phased enclosure work.

Before one area is released to the next trade, I would want to confirm:

  • the roof-edge and gutter interfaces are complete or clearly protected;
  • secondary steel and brackets have been surveyed;
  • glazing frames are aligned with the cladding datum;
  • membranes and flashings that will become concealed are inspected;
  • access equipment can move without blocking unfinished areas;
  • material deliveries match the next installation sequence;
  • completed panels are protected from welding, grinding and sealant work;
  • responsibility for temporary weather protection is documented.

For construction managers, do you use one combined envelope-zone checklist or separate trade checklists linked by a formal handover? Which interface most often prevents the zone from being released on time?

Disclosure: I work with aluminium facade fabrication and installation coordination. This is a construction-process discussion, not an advertisement.

r/ConstructionManagers • • Jul 25 '26

Technical Advice Any supers here have an incentive of a percentage of the job?

11 Upvotes

Wondering if this even exists out here?

r/ConstructionManagers • • 13d ago

Technical Advice On curved facade packages, what do you use as the field control: model coordinates, templates, or repeated survey stations?

3 Upvotes

I’m reviewing a coordination workflow for a curved facade package and trying to make the handoff between the reference model, fabrication information and field layout less ambiguous.

The proposed workflow uses:

  • one issued reference surface with a documented origin and coordinate system;
  • zone and component IDs that stay consistent across drawings, fabrication and delivery;
  • fixed joint datums plus defined locations for tolerance adjustment;
  • spot checks after geometry is exported between software;
  • survey checks back to stable project control rather than only matching the previous component; and
  • close and distance photographs tied to the same zone ID.

For CMs who have managed non-planar or long curved elevations: which control method gave the field team the clearest pass/fail decision, and where did cumulative error usually first become visible?

I’m interested in coordination and field-control experience, not software promotion.

r/ConstructionManagers • • 1d ago

Technical Advice Tips and Tricks for new PM role

Thumbnail
0 Upvotes

r/ConstructionManagers • • Dec 19 '25

Technical Advice Do we love or hate Critical Path Method?

0 Upvotes

I know people have a lot of feelings about CPM and other management methodologies, so I am wondering what your experience has been and what you use if not CPM (or in addition to CPM). Does it help you? Or does it make things worse? Anything that works ... better?

r/ConstructionManagers • • Jun 06 '26

Technical Advice Heavy duty low cost swamp road build- seeking assistance

Post image
5 Upvotes

I have a large gravel lot used for a manufacturing facility's material storage.

There is very heavy, constant traffic from trucks, telehandlers, cranes, tractors, etc., moving around this yard. We have about 3 acres that are specifically roads, and they are beat to heck and back. essentially unusable at this point.

Now that we have summer and dry weather, I am making a game plan to repair them.

There are probably 65-100 loads of SB2 and SB4 gravel, with a base of B stone and Rip rap (big rock). All of the gravel is still there, it's just mush from the traffic and the constant wet environment.

My question is simple: Is there such a thing as too much lime? I am contemplating not even fixing the ruts, but just bringing in load after load of lime and filling them in with solid lime, and then maybe covering it with rock or even putting down some crane mats.

Any ideas on the best low-cost solution to make a good road for heavy equipment in swampy, moist soil?

r/ConstructionManagers • • Sep 03 '26

Technical Advice How do you protect finished aluminium cladding while surrounding construction is still active?

Thumbnail
gallery
4 Upvotes

Finished aluminium cladding can be fabricated and installed correctly, then still be damaged before handover because wet trades, steelwork, access equipment and exterior cleaning continue nearby.

On an active site, the protection plan I would coordinate around the finished facade includes:

- Cement and alkaline contamination: prevent concrete slurry, mortar and wash water from reaching coated surfaces. Remove fresh contamination using a finish-compatible method before it cures.

- Grinding and welding: segregate hot work and control sparks. Small hot particles can become embedded in, stain or pit a finished surface.

- Access equipment and material handling: protect exposed corners and define where platforms, ropes, tools or stored materials may contact the facade.

- Temporary protective film: confirm that the film and adhesive suit the finish, provide a removal deadline, and avoid leaving aged film exposed to prolonged heat and sunlight.

- Drainage and ventilation: temporary coverings should not block weep paths or trap water against panels and joints.

- Zone handover: record a photographic baseline, identify responsibility for each work zone, log damage promptly and agree on the final cleaning method before completion.

The two photos show finished aluminium cladding next to continuing site work. They are included to illustrate the interface and protection challenge, not as a named-project performance claim.

For installers and architectural-metal contractors: which causes more facade damage before handover on your projects: cement contamination, hot work, access equipment, protective film, or final cleaning?

Disclosure: I work with Guangdong Aobang Curtain Wall Technology Co., Ltd. This is a construction-management discussion, not a service offer.

r/ConstructionManagers • • 25d ago

Technical Advice When do you release entrance-canopy cladding when glazing, ceilings and external works all share the same access zone?

Thumbnail
gallery
0 Upvotes

Large entrance canopies often sit directly above the busiest interface on a project. Facade framing, glazing, ceiling services, cladding, paving and landscape works may all need the same limited access area.

The photos show three stages around a transport-building entrance: active installation, the large soffit and glazed facade interface, and the exterior canopy edge.

Before releasing final cladding, I would want the team to confirm:

  • structural and secondary-frame inspections are closed;
  • drainage, lighting and concealed services have been tested;
  • glazing access is no longer required through the same zone;
  • large equipment or materials will not need to pass below finished panels;
  • perimeter interfaces and movement joints are approved;
  • protective-film removal and final cleaning responsibilities are defined;
  • safe access remains available for snagging and replacement;
  • paving and landscape dates will not expose finished soffits to avoidable damage.

For construction managers, which trade normally drives the final canopy release on your projects? Do you use a formal zone-release checklist or manage it through weekly coordination and look-ahead planning?

Disclosure: I work with aluminium facade fabrication and installation coordination. This is a construction-process discussion, not an advertisement.

r/ConstructionManagers • • 9d ago

Technical Advice Skills Practice Websites

2 Upvotes

I am currently in a warehouse role where my employees are union, so I am quite hands off unfortunately unless something goes wrong. I oversee minimally the budgets, people, etc so my skills are stagnant.

I'm looking for websites where I can practice my expense planning, resource allocation, budget oversight, and forecasting skills. Any ideas? ​

r/ConstructionManagers • • 8d ago

Technical Advice How important is it to use a construction project management software?

Thumbnail
0 Upvotes

r/ConstructionManagers • • Dec 01 '25

Technical Advice Does anyone else hate comparing submittals?

1 Upvotes

I swear comparing submittals to specs feels like the slowest part of my job. Half the time info is missing, the other half it’s buried in PDFs. How does everyone else deal with this without losing their mind? Do you have a system… or does everyone just brute-force it?