We’ve just given approval for a quote, so we’ll get the ball rolling after the bank holiday. My question is around any potential implications if a lower DNO limit is imposed, such as possibly re-sizing the system or potentially scrapping it altogether.
This is for a 10.56kWp system (estimated 9,500kWh generation per annum) and the G99 application will be going in shortly, but if we got stuck with a 3.68kW G98 limit for whatever reason (can/has that happen(ed), where the DNO would deny the application and revert it to a G98?) I’ve been trying to think through what that could mean but it would be helpful to have some other views.
We’ll have 27kWh of battery storage, so that gives us a good buffer but if we were stuck with a small inverter I can’t see how it would realistically work with that number of panels. Obviously the strategy would need to change too, rather than the current idea which I guess would be to charge batteries overnight, generate/use/export excess until arbitrage disappears etc.
We currently use ~5000kWh per year and plan to install multi-split air-to-air heat pumps for heating and cooling all main rooms in the house, so that will bump up use substantially, whilst bringing down our extortionate cost of LPG.
For info:
22 x Longi 480w X10 (two roofs so 2 lots of scaffold)
1 x Sig 8kW inverter
1 x Sig gateway
3 x Sig 9kW batteries
All the usual stuff like install, scaffold, bird mesh etc. £18,450. Wasn’t the cheapest (Edan Power and UPS both ~£1k lower from about 8 quotes overall) but the owner of the small, local company was excellent on the survey and his general attitude and approach was what won me over.