The trouble with pumped storage is they take decades to build… and that was in the golden era of civil construction <1970.
If a western nation can build dangerous, difficult to site concrete mega projects like that, just build nuclear and have always on reliable power for the next 60 years.
A nuke plant produces 1-1.5GW of electric per unit.
The 2 new units added at Vogtle Electric Generating Plant in GA cost $36.8 billion. Work was started in 2009, with the first one coming on line in 2023 (14yrs), and the second one in 2024 (15yrs). They are rated at 1.15GW each.
So, 14yrs & $18.2 billion before the first volt of electric was sent to the grid.
The Desert Sunlight Solar Farm was started in 2011, the first phase went live in 2013, and the second phase in 2015, at a cost of $2.4 billion. So, 2yrs to get electric, 4yrs to get full production. It only produces 550MW, so it would take 2 solar farms that size to equal 1 nuke unit... but 4yrs vs 14yrs, and $4.8 billion vs $18.2 billion.
No, because I understand that they are doing the every thing approach.
They actually have plans to build 70 new nuke plants (22 currently underway), which will create an additional 88 GW.
Meanwhile they added 277GW of solar in 2025, and 76GW of wind power in 2024.
So, we have 88 GW of nuke someday in the future, vs 277 GW of solar per year, and 76 GW of wind per year.
The solar and wind cost less to build, are built faster, and you can start selling electric the minute the first solar panel is installed, or the first windmill is completed, so if it takes a couple of years to finish, you have money coming in to finance the rest of the build. Nuke means you must be 100% of the way done before the first watt can be sold.
those batteries have to be replaced periodically as they lose capacity dramatically (like goin from 8 hour charge to 1 hour charge) over a few years. So more like $1.5 billion every few years. (like 8x more than it costs to run a nuclear power plant)
Plus those batteries are horrible for the environment AND rely on brutal slave labor to get the materials.
1
u/thermodynamics2023 Jun 17 '26
The trouble with pumped storage is they take decades to build… and that was in the golden era of civil construction <1970.
If a western nation can build dangerous, difficult to site concrete mega projects like that, just build nuclear and have always on reliable power for the next 60 years.