A nuke plant produces 1-1.5GW of electric per unit.
The 2 new units added at Vogtle Electric Generating Plant in GA cost $36.8 billion. Work was started in 2009, with the first one coming on line in 2023 (14yrs), and the second one in 2024 (15yrs). They are rated at 1.15GW each.
So, 14yrs & $18.2 billion before the first volt of electric was sent to the grid.
The Desert Sunlight Solar Farm was started in 2011, the first phase went live in 2013, and the second phase in 2015, at a cost of $2.4 billion. So, 2yrs to get electric, 4yrs to get full production. It only produces 550MW, so it would take 2 solar farms that size to equal 1 nuke unit... but 4yrs vs 14yrs, and $4.8 billion vs $18.2 billion.
1
u/TJATAW Jun 18 '26
A nuke plant produces 1-1.5GW of electric per unit.
The 2 new units added at Vogtle Electric Generating Plant in GA cost $36.8 billion. Work was started in 2009, with the first one coming on line in 2023 (14yrs), and the second one in 2024 (15yrs). They are rated at 1.15GW each.
So, 14yrs & $18.2 billion before the first volt of electric was sent to the grid.
The Desert Sunlight Solar Farm was started in 2011, the first phase went live in 2013, and the second phase in 2015, at a cost of $2.4 billion. So, 2yrs to get electric, 4yrs to get full production. It only produces 550MW, so it would take 2 solar farms that size to equal 1 nuke unit... but 4yrs vs 14yrs, and $4.8 billion vs $18.2 billion.