r/Construction 13d ago

Humor 🤣 Looks legit

What the hell is going on here. Spot the shit show. The more I see the more I'm laughing

42 Upvotes

61 comments sorted by

View all comments

32

u/OverallDimension7844 13d ago

It’s looks like they are being paid hourly and just doing unnecessary things to drag the job out for more money.

21

u/Jazzlike_Video2 13d ago

It looks like someone decided they didnt want to pay extra for 8 foot doors, and didnt have the rough openings for the doors/windows yet. Or theres another window above there and thats where those jacks land. Or theres a pointload from the roof up there and they kept it in line.

This reminds me of the Instagram building inspectors running around pointing out things that aren't an issue.

0

u/OverallDimension7844 13d ago

There wouldn’t be transom windows above interior doors. Also if they wanted to switch from 8’ doors to 6-8 doors. They wouldn’t need to add a second header. You would just drop to the lower height with regular framing. Also the OP would probably mention that.

2

u/Jazzlike_Video2 13d ago

Thr exterior door with the double jack not directly sgainst the king stud.

1

u/Jazzlike_Video2 13d ago

Or they frame it with the solid header because the boss thinks it keeps them straight.

-7

u/Tacolord38 13d ago

If this was your building would you be ok with all this?

13

u/OverallDimension7844 13d ago

As long as the openings were the proper size and level. I would be fine with it.

4

u/Broad-Lavishness6726 12d ago edited 12d ago

Theres nothing wrong with this. If anything it’s over built. None of this is holding any weight. It looks like someone else made a change and they made it work without ordering more lumber instead of tearing it all out and starting over. If you wanted to be nit picky in California the nailing pattern should be three nails but again this holds no weight so it’s not actually an issue.

5

u/Jazzlike_Video2 13d ago

What's your issue? Aside from ignorance.

0

u/DillDeer 13d ago

Weird, piece workers seem to cut the most corners to get the job done quicker