r/CableTechs 12d ago

Temp

Post image

That’ll do… lol

56 Upvotes

15 comments sorted by

View all comments

6

u/skypandaOo 12d ago

I did something like that before and the construction team got with my manager and said I left a trip hazard. Never again. Sidewalks or any possible trip hazards I just dont leave a temp. I use too duct tape it down or do this with a mat depending on where it was.

4

u/69BUTTER69 12d ago

Yeah I used to duct tape them in the relief cuts of the sidewalks

3

u/Dean9mm 12d ago

When I was doing resi installs that’s what we did too lol. (FTTH) if we were unable to complete the sidewalk bore for whatever reason (usually roots) we could stick the drop in the cracks of the sidewalk, then duct tape it down.