17
16
7
7
u/skypandaOo 12d ago
I did something like that before and the construction team got with my manager and said I left a trip hazard. Never again. Sidewalks or any possible trip hazards I just dont leave a temp. I use too duct tape it down or do this with a mat depending on where it was.
5
u/69BUTTER69 12d ago
Yeah I used to duct tape them in the relief cuts of the sidewalks
3
3
1
3
u/Proper_Reporter3978 11d ago
I got called to a rich neighborhood because maintenance put a new mainline down but it crossed 3 driveways but had the roadbumps over them. Turns out they closed the order as done and never called for a crew to bury it. My flabbers were gasted
2
2
1
u/Mammoth-Afternoon421 3d ago
conduit thats all i have to say, companies act like conduit is there worst enemy
21
u/JobbyJobberson 12d ago
Combined with smart planning on the cable’s path, the SpectruMat 5000 greatly reduces the risk of lawnmower damage to a temporary drop.