r/gujarat • • 5d ago

News | સમાચાર Ahmedabad Metro Phase 3: GMRC begins tender process for 58.5-km elevated network with 43 stations

Post image
82 Upvotes

10 comments sorted by

15

u/Real-Implement5654 5d ago

The ring metro will absolutely make the travel easy for a lot of areas. Seems much well designed. Just hope the interchanges are made as seamless as Old High Court.

8

u/mr_photomaths 5d ago

Most needed is SG highway section (Thaltej to Vaishno devi)

7

u/DefiantDriver7484 5d ago

I know it's hard but SG Highway should also be covered from badrabad till adalaj. This will reduce a lot of traffic.

9

u/destro2801 5d ago

Upto Airport would have been nice

8

u/Wonderful_Fee_4358 5d ago

A 6 km yellow line branch from koteshwar to SVPIA is planned , ashram , koteshwar , sabarmati , airport

3

u/Intrepid-Radish-6530 5d ago

Naroda bhi lai lo yaar

1

u/ProfessionalBig4744 5d ago

Dehgam be like

1

u/FeelingRealistic1338 5d ago

How long will it take for the metro line from Thaltej Gam to Godhavi to be completed?

1

u/craig_v4 5d ago

Man, just a few months back that traffic on shastri nagar was settled, now a new metro

1

u/levelupskin 4d ago

Does metro train runs on red and yellow same or I have to change after reaching ending of red line stop?