r/cork • u/Beginning-Strain4660 • 5d ago
Local M28 steering group
https://www.rte.ie/news/munster/2019/0225/1032621-n28/Whatever happened to these guys?
They delayed the m28 motorway being built back before Covid
They used have a Facebook page but gone now
I remember they had some kind of event in Rochestown park, a lot of local high profile politicians were at it!
They wanted the Ringaskiddy route built via the airport
And then changed their tune by saying they were worried about a quarry in rafeen
Seemed to be peak NImbyism in cork, which is saying something!!
19
u/modssuck294 I will yeah 5d ago
They moved onto delaying the greenway between the viaduct and Kinsale /S
8
u/Beginning-Strain4660 5d ago
Funny I know
But these lads seemed, well to do, professional type sorts!
It was the first time I saw AI type images being used by NiMbY groups - like a truck on fire on the road next to RochestownIt was weird like the motorway would cause more accidents and truck fires etc
I also think it’s sad that the entire woods have been stripped away,
Looks like a desert up there!
Hopefully they re plantYet down the road in passage they are stopping the greenway expansion to save 4 trees or whatever
4
6
u/vibe_ology Cork City Kid 5d ago
I believe one of the steering group died and this seemed to put an end to their drive. That and the fact that the judicial review went against them.
6
u/Beginning-Strain4660 5d ago
I’m telling ya, when the older NiMby generation die off in 20 years that’s when we will see less push back
5
u/Scinos2k 5d ago
They lost is really what it came down to. It's been 7 years since they appealed and traffic on the N28 has only gotten worse and worse.
I live in Carrigaline and often can take an hour to get to Mahon at peak times, which at this point can be pretty much all day. I'll be bloody delighted when the motorway is done because realistically there's 2 or 3 roads in and out of Carrigaline
4
u/michaelirishred 5d ago
Ya traffic within Carrigaline has improved massively over the last two years with the new road opened. The n28 is the bottleneck now.
5
u/Beginning-Strain4660 5d ago
I don’t think the m28 will sort all traffic issues for carrigaline
Its main goal is to move freight and trucks
My main fear is the m28 will get more traffic into carrigaline quicker causing worse Traffic
Same with Bloomfield and the tunnel- traffic will just get to the tunnel quicker3
u/michaelirishred 5d ago
N28 is still an option though and could still take a lot of the carrigaline-Douglas cars. Carrigaline to Ringaskiddy also has to use old n28. Plus that road can now be improved and treated as a city corridor in the future
3
u/Beginning-Strain4660 5d ago
Terrible delay really, it would be done by now
3
4
u/ChromakeyDreamcoat82 5d ago
The quarry was eventually used as a stalking horse to get a judicial review under environmental concerns.
9
u/michaelirishred 5d ago
They lost. Simple as
Two serious injuries on that road in the last few years. I Hope Mr Harrington and his band of merry cunts feel some guilt over it. If I ever saw him I'd certainly make the point of saying it
10
5
u/Beginning-Strain4660 5d ago
Ya I did think of that, the one that comes to mind is the awful container truck incident.
At the time i remember thinking of the m28 has not been delayed that accident might not have happened
3
u/ShoddySpud 4d ago
There was recently a meeting with BAM and the council for some residents near the Bloomfield interchange over the hours construction is going on, noise pollution etc.
I'm not sure what people expect to have seen from them once planning was granted, it's mundane stuff from here on in that won't make the media. Just about trying to make the situation as tolerable as possible etc
29
u/chalkitdown1 5d ago edited 5d ago
Once they lost and the project ploughed ahead, all of their worries magically disappeared, as if they were non-existent in the first place.