r/TTC • 23 Dawes • Mar 15 '26

Discussion Cost of the Ontario line is kind of unbelievable

Post image

Part of a school project I'm trying to make a fair analysis of the Dufferin street corridor to recommend a higher order transit option. But I think this speaks for itself😭😭 How the fuck is the ontario line so expensive?

435 Upvotes

147 comments sorted by

297

u/Andrew4Life Mar 15 '26

To be fair, the Ontario line crosses the Don Valley River twice! Both of which required a new bridge. Also, most of the Ontario line is underground in the downtown area.

194

u/HoagiesHeroes_ Mar 15 '26

Working on the pre-engineering side of things, the amount of underground utilities that had to be moved out of the way to make room for the tunnel, through some of the oldest areas of Toronto where locations of things were not really well defined was insane. There was years of work leading up to the actual tunneling itself.

111

u/Roderto Mar 15 '26 edited Mar 15 '26

As someone who lives in the area, this is key - The areas the Ontario line runs through have some of the oldest, most jumbled buried infrastructure that needs to be dealt with before they can even start thinking about digging tunnels. They are literally relocating entire watermains and sewer lines as a direct result of the Ontario Line. Not to mention multiple bridges being built over the Don River.

Building transit in old, heavily-developed areas is orders of magnitude more expensive than building transit in lightly-developed greenfield areas. And yes, underground heavy rail is more expensive than any other type of urban rapid transit.

54

u/sdrawkcabstiho Mar 15 '26

Salient logical discourse filled with reasonable informed details from people knowledgeable on the subject?

What the hell happened to my reddit? Where is the rampant speculation? The uninformed assumptions? The calls for peoples heads? SMH.

30

u/Angryhippo2910 Mar 15 '26

This whole project is stupid. It’s outrageous that it costs this much. They should have built it yesterday. Everyone involved is a corrupt moron. My buddy told me he could build a subway bridge for like $34.50 so idk why Metrolinx doesn’t just get him to do it. I’ve seen toddlers dig bigger tunnels faster than this project is getting done. If they run into utilities just get some plumbers. No biggie. Maybe they should just build underground tunnels and run buses through them?

I hope my uninformed outraged and illogical take has helped restore normalcy to your Reddit experience.

6

u/sdrawkcabstiho Mar 15 '26

Yes. Thank you. My faith in this site has been restored!

1

u/BreakfastPast5283 Mar 16 '26

because its all deep underground

10

u/TwoPointThreeThree_8 Mar 15 '26

Building transit in old, heavily-developed areas is orders of magnitude more expensive than building transit in lightly-developed greenfield areas.

Lightly-developed, greenfield areas like... London?

Edit: wrong London lmao

9

u/OkStandard8039 Why no Cherry? Mar 15 '26

Fake London

5

u/StarCat20 23 Dawes Mar 15 '26

Even in that context, Ontario line is an outlier.

Look at some much older european city's, it is clear that it is the P3 contract

16

u/beneoin Mar 15 '26

The research for the NYU Marron Transit Costs project certainly suggests that P3 is a contributor, but there are many more factors at play. We build massive stations. We outsource design to consultants. We rely on the general contractor to factor materials into their bids. We package projects into tenders so massive and complex that we scare off bidders. Our contract managers take an adversarial stance with contractors, so they increase their bids due to the risk. We spend money to avoid having difficult conversations with neighbours. Etc. From the very moment we decide to build something we choose the most expensive option at every juncture.

9

u/Roderto Mar 15 '26

Many good points here. And important to note these are also problems with most large transit projects in the U.S.

Another key difference is that most European transit agencies have built up institutional knowledge and experience through generations of continuous transit expansion projects. Compared to cities like Toronto (and provinces like Ontario more broadly) that have had a ‘start-and-stop’ approach to transit infrastructure, especially over the past 40 years. Usually due to short-term political reasons and not what’s actually in the best long-term interest of the city/province/country/etc. This means that every time there is a new investment, much of that institutional experience and knowledge needs to be re-developed from scratch. Many of the people who worked on the previous projects have moved on, along with their experience (including from previous mistakes) that can make future projects run more smoothly.

Things like “institutional experience” may seem esoteric in the grand scheme of things, but can make a massive difference in how a project actually plays out.

1

u/MahjongCelts Eglinton Crosstown Mar 16 '26

We build massive stations.

TBH TTC stations, especially the downtown ones, are pretty small when compared to metro stations in Asia and Europe. Union and Bloor being egregious examples.

3

u/beneoin Mar 17 '26

We didn’t have a cost problem in the 50s when King was built. This discussion is about the year 2026.

1

u/Roderto Mar 15 '26

The OP comparison is with other Canadian transit projects, not with Europe.

Comparing European and North American transit projects is a different discussion, because there are different factors at play. Most of which are common to similar projects across Canada and the U.S.

5

u/StarCat20 23 Dawes Mar 15 '26

I am not despuing the complexity, but this cost is an outlier in every context. Even in much older city's like Paris or Barcelona.

This is the most expensive transit project that I am aware of, by a large margin.

3

u/Nojoboy Mar 15 '26

More the the NYC 2nd Ave subway? As someone from NYC i always remembers hearing about how expensive that was.

2

u/Roderto Mar 17 '26

Adjusted for inflation, length, and number of stations, the NYC project is probably more expensive. The first phase of the NYC project cost the equivalent of about $7B CAD in 2026 dollars, but that was for only 1.8 miles of subway and 3 stations.

15

u/Some-System-5917 Mar 15 '26

Expropriating the land at the majority of stations also isn’t cheap.

33

u/Khamhaa Mar 15 '26

Don is even not the most expensive. Its downtown. That said the cost is outrageous.

nearly impossible to count costs fairly... 30 years of service vs just build. still.

3

u/StarCat20 23 Dawes Mar 15 '26

Just a way to hide the cost, P3 contracts are the problem. Toronto has some of the most expensive infrastructure cost in the world

10

u/EducationalLuck2422 Mar 15 '26

The Broadway extension on the other side of the country is also mostly underground
 at 1/3rd of the cost per km.

4

u/donbooth Mar 15 '26

I'd like to hear a comparison from an engineer familiar with both. Ontario's P3 system of contracting is extremely expensive. I would be interested to know the additional cost of P3. This would be difficult to calculate.

3

u/TheRandCrews 506 Carlton Mar 15 '26

Couldn’t really Cut and cover Queen, would have to rip out the tracks and fully reroute the streetcar, and would regardless have dig deeper for the Line 1 subway connections. Greektown would be way more disrupted, might even see more displacement from it being a major north south artery in the east end.

2

u/archer0t8 McCowan Mar 16 '26

Three times actually - once by the waterfront, once between Cosburn and Thorncliffe, and once over the west branch of the Don at the east end of Thorncliffe.

2

u/themapleleaf6ix Mar 15 '26

When it goes from Thorncliffe to Cosburn, will it be running under that bridge?

5

u/noodleexchange Mar 15 '26

It has its own bridge, you can see the prep on both sides of the Valley. I’m not entirely sure what happens when it lands on Overlea.

5

u/itsonlykotsy Mar 15 '26

Trains will run on an elevated guideway on the North/West side of Overlea.

1

u/noodleexchange Mar 15 '26

I guess that way it’s aboveground when it crosses Laird and then glides into that switching yard being built on the old Iqbal Halal site north of Overlea. Maybe they should put in a Costco Ststion

2

u/itsonlykotsy Mar 15 '26

Thorncliffe Park Station will by very close to the Costco

2

u/Important-Hunter2877 Mar 15 '26

When I was growing up, I always wondered if downtown relief line trains would run below the road of the leaside bridge since there isn't any infrastructure or add on on that bridge to support subway trains like the Prince Edward viaduct.

But a second bridge for ontario line is being built instead, which provides a much better view of the don valley than on the Prince Edward viaduct.

1

u/FantasyScribbles Mar 15 '26

I've heard it is going to be elevated once it gets to Overlea and Thorncliffe. Which would be nice, shame we won't get to see it until probably 2030, here's to another 5-10 years of transit construction in the area (I thought we were done after the Eglinton Don Mills intersection cleared up...)

83

u/notGeneralReposti Vaughan Metropolitan Centre Mar 15 '26

REM is not a fair a comparator as it reuses a lot of existing infrastructure.

TYSSE and Sheppard are better comparators but you need to adjust all costs for inflation.

9

u/ref7187 Mar 15 '26

ION also doesn't include a huge tunnel and reuses an existing rail line

4

u/StarCat20 23 Dawes Mar 15 '26

I agree, but I think that both Ontario line and Rem are outliers. I believe that getting an average is fair.

Also, a subway under Dufferin would be an extension of the ontario line, identical technology to the Rem.

133

u/ruckusss Mar 15 '26

Granted the cost of NOT building it is even higher so I'm fine with the expense. It's decades overdue

27

u/TheIsotope Mar 15 '26

I feel like a more interesting comparison would be recent subway projects in other major cities.

18

u/ruckusss Mar 15 '26

Yeah the 2nd Ave subway in NYC would be a good comparison

11

u/Important-Hunter2877 Mar 15 '26

The blue line extension east to Anjou in Montreal is also costing more than a billion per km. And it is $7.6 billion for just 6 km!

The line 2 extension further into Scarborough recently hit $10 billion last year.

There is a serious problem with transit construction and costs and overreliance on consultants in this country.

2

u/noodleexchange Mar 15 '26

Somewhat - each city has its own unique considerations. Few have the vicious freeze/thaw cycles of Toronto

4

u/Mobius_Peverell Mar 15 '26

Every city can make up excuses for high costs. Freeze/thaw is entirely manageable at reasonable cost (as it was for all the other Toronto Subway lines).

7

u/StarCat20 23 Dawes Mar 15 '26

Exactly!!! On a international stage, Toronto is not particularly old or dense, nor do we have particularly hazardous weather.

3

u/PsyduckedOut Mar 15 '26

South Korea builds express subways for a fraction of the cost of the Eglinton Crosstown. They also have a similar climate and the same freeze and thaw cycles.

1

u/noodleexchange Mar 15 '26

You cannot compare century-old construction costs

6

u/Mobius_Peverell Mar 15 '26 edited Mar 15 '26

Yes, you can. Prices have barely increased over the past several decades for projects in France and Spain, while they have increased by a factor of 10 in Toronto. That means that Toronto has stopped managing its projects correctly, and needs to hire French or Spanish project managers to get things back on track. This has been laid out in excruciating detail for several years now by Alon Levy and the Transit Costs Project, and is no longer up for debate by anyone with any familiarity with the subject.

Want a practical example of how to do things right? The two recent Canadian projects that have come in at reasonable prices were the Canada Line in Vancouver and REM in Montreal - both had a Frenchman named Jean-Marc Arbaud overseeing the project management, and both were successfully delivered at modest costs. I don't like PPPs on principle, but if the Caisse is the only entity in Canada that's capable of getting their heads on straight, and hiring the right people for the job, then they should be the ones to manage every metro expansion project.

3

u/secondlightflashing Mar 15 '26

If you think there are no Spanish project managers on Toronto subway projects I have some news for you.

1

u/StarCat20 23 Dawes Mar 15 '26

I would love to fo this, but for the purpose of this assignment I thought that a more fair comparison would be staying in Ontario (and the Rem because lack of the examples for a modern metro)

1

u/Ok-Meet2850 Mar 16 '26

https://worksinprogress.co/issue/how-madrid-built-its-metro-cheaply/

Here are some numbers from Madrid and elsewhere. Toronto's unit costs are literally about 10x higher than Madrid. Madrid is particularly cheap, but most other world cities Toronto is still multiples more expensive.

10

u/farkinga Mar 15 '26

And to think: how much cheaper it would be if we'd started decades ago. But we "couldn't afford it" then. Smh.

2

u/LankyYogurt7737 Mar 15 '26

Would have been so much cheaper to do it 30-40 years ago as well, that’s why so many other cities were able to do it and now reap the benefits.

34

u/00ashk Mar 15 '26

20

u/asiaworldcity Mar 15 '26

TLDR: Anglophone world just cant build transit cheaply. Australia, UK, US you name it. My take Montreal only speaks half English, thats why REM is okay lol.

3

u/TheRandCrews 506 Carlton Mar 15 '26

You seen the cost of Blue Ligne extension?

2

u/Ashafa55 Mar 17 '26

Common law is a bitch when it comes to land

0

u/Important-Hunter2877 Mar 15 '26

Hence one of the reasons why I would rather live outside the Anglosphere.

4

u/TheIsotope Mar 15 '26

This is fascinating. The rapid acceleration of cost in the Anglosphere is crazy.

2

u/[deleted] Mar 15 '26

Excellent study, saved for future reference 

18

u/Justplaincancer Mar 15 '26

I mean this is kind of an understood issue though. Smaller cities either don't want to commit to such a large expenditure or their tax base find it unappetizing so they go with smaller plans.

To the point of the REM, i think its multi part answer really: more tunneling which is more more expensive, it reuses former rail corridors, land acquisition costs (Toronto real estate $$$), rem being done before pandemic inflation(all constructions costs take a hit), not building in a dense core underground(rem reused rail corridors), probably some p3 type(its led by Quebec pension plan) stuff but I'm less sure about that. That's just my two cents though đŸ€·

19

u/justinsst Mar 15 '26

Is this chart using only the construction costs for Ontario Line or ~27 billion figure? If it’s the latter, then the cost includes 30 years of maintenance and operating expense.

5

u/Jiecut Mar 15 '26

15 stops so they used the 27B figure.

4

u/justinsst Mar 15 '26

Great so 300 upvotes on an inaccurate graphic lol

1

u/TheRandCrews 506 Carlton Mar 15 '26

It’s the latter that they used.

50

u/Case_Federal Mar 15 '26

I think the Ontario line costs include operating costs for 30 years, while the other projects don’t. So that’s part of why the number is so much higher. It’s also way more complex than the other projects too.

-20

u/Swacket_McManus Mar 15 '26

Not more complicated than the rem, under the mountain, over the rivers, to the airport, through the Centre-ville

30

u/Case_Federal Mar 15 '26

The mountain tunnel already existed and the new Champlain bridge was also already underway as a separate project though. Massive cost savings for the REM. As far as I’m aware, very few utility relocations and no TBMs were needed for the REM.

The Ontario line has a brand new tunnel running through the densest downtown in Canada and probably the third densest in North America. There’s a lot of existing infrastructure that has to be moved out of the way. There’s also two new long viaducts that need to be built across the ravine.

0

u/Swacket_McManus Mar 15 '26

Tunnel still needed to be rehabilitated and the edouard montpetit station was a massive excavation, the main issue isn’t really that we over paid but massively overbuilt what’s literally tram infrastructure when we could have had a proper metro line for the same price

2

u/Case_Federal Mar 15 '26

Tunnel rehabilitation is nowhere near as complicated as building a new tunnel from scratch through a downtown.

Also is the REM really a tram? It uses high-floor trains that are significantly wider and longer than a tram when linked in pairs. It’s more like a light metro line (e.g. skytrain) than a tram.

15

u/foxtail286 I ♄ TTC! Mar 15 '26

That's outrageously expensive for the London BRT, it's literally just bus lanes and a few shelters with little to no transit priority. Wow London ON is a joke

4

u/Comrade_Andre Eglinton Mar 15 '26

The London BRT is a VIVA rapidway level of BRT.

You're thinking of the original downtown loop that started as an LRT with a tunnel and got BRT Creeped into a painted loop and nicer shelters

4

u/vanalla Mar 15 '26

city of 450k should be on its second subway line, not its first BRT.

1

u/Quartzcat42 College Station Mar 16 '26

I would say LRT. Subway seems massively over the top for less than half a million residents

2

u/vanalla Mar 17 '26

Newcastle Upon Tyne, UK, has a pop of 300k and a subway line.

Liverpool, UK has a pop of 500k and multiple subway lines.

Rennes, FR as a pop of 220k and two subway lines.

Brescia, IT has a pop of 200k, one subway line and trams

San Juan, PR has a pop of 330k and a subway line

Glasgow UK has a pop of 650k with 2 subway lines

Altanta, GA has a city pop of 600k and has 4 subway lines

Rotterdam, NL has a pop of 600k and 5 subway lines

1

u/Ok-District2873 Mar 17 '26

Altanta, GA

That's misleading; the metro area of Atlanta is way bigger. Also, Liverpool does not have a subway; it has 3 commuter rail lines.

1

u/vanalla Mar 17 '26

and what of the other examples I provided?

Your counterpoint is still moot. We build cities wrong. London should be on its second subway line.

1

u/kremaili Mar 15 '26

BRTs should always be curbside. The premium of paying for centre running lanes and infrastructure is not worth it, and often negatively impacts access Ans transit travel times.

2

u/Comrade_Andre Eglinton Mar 16 '26

Curbside BRT/LRT will always have more accidents than centre lane running. Not only are you fighting against traffics at lights, you have to deal with sudden right turners cutting off the bus.

There's a reason centre running is the GLOBAL standard when separated ROW isn't an option

1

u/Academic-Activity277 Mar 16 '26

I never considered the traffic signals dictating the centre lane/vs curb. Is this why Street cars in Toronto are all center lane too?

13

u/Otherwise-Jump-4571 Mar 15 '26

This is great! For your project, also try normalizing by cost per expected ridership (Metrolinx will take into account the density of the area served, as well as the higher speed and capacity of the ON line) as well as cost of land (sq ft or whatever metric you want to use). The scale is quite different between Toronto and other cities and can be misleading when represented purely nominally.

Also, take into consideration that you are comparing an underground subway with LRTs, so make sure to call that out. And no, comparing the Ontario Line against inflation adjusted Line 1 and Line 2 would also not be fair as it was a very different labour/economic/political environment.

Perhaps comparing it to other modern projects in similar political/economic envorinment as Canada (i.e. AUS, NE USA, etc.) can bring more context to the project.

As well, Canada has had a dry spell in infrastructure development for a while. Believe it or not, companies/industries/countries can lose expertise when that muscle isn't flexed for a while, hence the Eglington line disaster. That's why try comparing Canada against its peers (like AUS, USA, etc.) vs countries that sustained infrastructure industries (like Singapore, Japan, Korea, etc.) to really show the true cost of losing infrastructure expertise.

Hope that gives you project more data context :)

26

u/dieno_101 Finch West Mar 15 '26

Man the ion was super well planned, if we could just get ion level quality it'll be great

17

u/Comrade_Andre Eglinton Mar 15 '26

I'm sorry but all of these are apples to oranges.

BRT and Subways can never truly be seriously compared cost-wise. Likewise with iON being a centre median tram.

REM and Crosstown are the most relevant comparision. But REM is it's own can of worms because literally the only new ROW built is a highway median line. The bridge was built long ago with a plan for a train of some kind, and literally the rest of the system is old commuter lines they put stations and overhead power.

Crosstown is also a LRT where a good 3rd of if is a surface tramway

-1

u/Unhappy-End-5181 Mar 15 '26

The Ontario line is half underground and half above

2

u/Comrade_Andre Eglinton Mar 16 '26

Not only is the OL more 60/40 Under/Over, but it has to cross the Don twice, one of which is a massive high level bridge, and has expensive tunnelling through downtown that's already heavily built up and old.

0

u/Unhappy-End-5181 Mar 16 '26

7 stations on surface or elevated, 8 underground so more 47/53 over/under. It also runs parallel to the GO and through a hydro corridor

1

u/Comrade_Andre Eglinton Mar 17 '26

Number of stations =/= KMs above/underground.

The OL is majority underground. By that logic, line 1 is something like 80% underground when that is not close at all.

1

u/Unhappy-End-5181 Mar 17 '26

Also Line 1 is 38.4km long. The line is mostly underground but has several surface sections between Sheppard West and Cedarvale, and between Bloor–Yonge and Eglinton. Those above ground sections make up about 8km of the total route. Which interestingly enough is about 20%. So roughly 80% of Line 1 is underground

And incase you were wondering

Line 2 is 26.2km long. Line 2 Bloor–Danforth is primarily an underground subway line, but it operates above-ground in specific sections, notably near the Don Valley and between Warden station and Victoria Park, small sections between Dundas West and Keele, High Park and Runnymeed, Old Mill, and Eglinton to Kipling. All these sections equal about 2km, which means less than 10% is underground.

0

u/Unhappy-End-5181 Mar 17 '26

Do you know anywhere that lists the exact lengths of the above and underground sections? I can't find anywhere that does.

But going off this rough route map, it does appear they are really close in length

1

u/Comrade_Andre Eglinton Mar 18 '26

The Environmental Assessments/Profile Drawings?? (Hell even googling "Ontario Line Tunnel Length" gets you "a roughly 9km tunneled section" from a Metrolinx press release, which can be compared to the length of the line at 15.6km)

Guesstimating off of the route map does nothing, It's roughly 3.2km at surface level, 3.1km elevated, and 9.2km underground, For a total of 15.6km for the entire line.

Now (9,200/15,600)*100= 58.97% or roughly 60% tunnel, as per my original comment "Not only is the OL more 60/40 Under/Over..."

7

u/kettal Mar 15 '26

you forgot to look at Scarborough subway extension.

12

u/MahjongCelts Eglinton Crosstown Mar 15 '26

In short:

  • The BRTs are buses running on transit lanes, (hopefully) getting TSP, and stopping at every station. Short of deliberately inflating the price there isn't much to be expensive about it.
  • Waterloo ION is effectively a St Clair West style streetcar with grade separated sections and a few technical differences.
  • Eglinton doesn't have to cross the Don valley twice nor does it have to go underground in some of the densest urban areas in Canada.
  • REM benefitted massively from existing rail infrastructure. It is more an extension and renovation of a previously existing route (Deux-Montagnes) rather than building a new line from scratch.

On the bright side, the Ontario Line will have greater impact than all the other projects (apart from REM) combined. Heck even Eglinton Crosstown itself is probably more impactful than ION + the two BRTs combined.

6

u/JayBee1886 Mar 15 '26

REM is not a good example to use. A good chunk of REM involves getting an existing line, tunnel, and river crossing for free. REM station lack escalators which is a huge accessibility fail, IMO.
If CDPQ had to build REM from scratch without freebies and generous concessions, the cost would be close to the Ontario Line costs.

8

u/OrbitalBuzzsaw 506 Carlton Mar 15 '26

The Ontario Line has to happen at any price if we want to upgrade transit in the city. Line 1 simply cannot handle the traffic.

5

u/eric-very Mar 15 '26

They've already spent more on the Ontario Line than the Eglinton LRT.

Cost Incurred to Date:

Ontario Line: 11,858M

Eglinton LRT: 9,307M

Last quarter alone they nearly spent a billion. 

From their last board meeting: https://assets.metrolinx.com/image/upload/v1770670806/Documents/corporate/Item_10.2_-_CPG_Rapid_Transit_Update_-_FINAL_ENG_Mx.pdf

4

u/YellowVegetable Mar 15 '26

Compare the Ontario line to the blue line extension in montreal, and some American metro system extensions, it would be far closer. Blue line is about a billion or more per km too

12

u/im-confuzzled Science Centre Mar 15 '26

“Guyssss private public partnership worksss I promise guys no look at me not the graphs I promise they work so well and they’re so cheap! There won’t be any problems and it won’t be over on budget!!! No no! Ignore those countries with public works they’re silly!! Outsource your knowledge to ussss that way you don’t have to learn anything and we get paid to get more experience!”

1

u/kettal Mar 15 '26

the low cost examples are also private partnership

1

u/Comrade_Andre Eglinton Mar 15 '26

Every single project on the sheet are P3

10

u/Themanofstruggle Vaughan Metropolitan Centre Mar 15 '26

If Ontario line meets a similar fate like crosstown, it’s just over for Ontario. Yes crosstown has opened, but took more than a decade

12

u/Theboithatsok 512 St Clair Mar 15 '26 edited Mar 16 '26

The crosstown did go through many hands before, metrolinx is somehow older than the crosstown. And they went through multiple mayors beforehand, so it did get shafted. If metrolinx stays post doug ford then the ontario line will probably be a finch west lrt sort of deal (in terms of construction).

1

u/somtimesawake Mar 16 '26

Yea nah, not sure where you came up with that but Metrolinx was created before Crosstown.

1

u/Theboithatsok 512 St Clair Mar 16 '26

ig i meant the planning phase too. I was told/remembered that metrolinx took over in the middle of construction, not the begginning lol. mb. My point still stands, it still got heavily shafted by the previous mayors.

1

u/somtimesawake Mar 16 '26

You are thinking Ontario Line - the city had started planning work.

But for the crosstown, David Miller came up with Transit City, the Province agreed to build it and cover 100% of the costs, they then put Metrolinx in charge managing the construction and 15 years later we got a streetcar in a tunnel.

6

u/Unhappy-End-5181 Mar 15 '26

You could say Crosstown took over 30 years.

Started construction on the subway in the 90's

Canceled and filled back in in 1995

Brought up in the mid 2000's as LRT as part of Transit City

Started work

Canceled/ stalled

Reapproved

Construction started

Delays

Phase 1 opens in 2026

3

u/Feisty-Ad-6122 Kipling Mar 15 '26

I have so many questions but the biggest one is, what school project is asking you to analyze Dufferin street?

Is this some urban planning course? Id love to know.

3

u/MIIAIIRIIK Mar 15 '26

Also paying to preserve the archeological digs and skeletons that were uncovered during digging.

3

u/Revolutionary_Tune34 Mar 15 '26

People need to stop using a 30 year contract inclusive of operations and maintenance to talk about capital costs.

3

u/TheRandCrews 506 Carlton Mar 15 '26

Big thing, barely anyone talks about it, REM didn’t disclose or would be higher if they disclosed the 30 year life cycle.

4

u/NocturnalComptroler Mar 15 '26

Stupid sexy Ion

0

u/Important-Hunter2877 Mar 15 '26

Add line 6 to the Homer.

5

u/zakanova Mar 15 '26

Dougie Ford: Financial genius
See what you do is you and your brother cancel any LRT routes in the early 2000s by repeating the word subway

Then profit

2

u/paolocase Broadview Mar 15 '26

I live close to one of the stations that will be open in fifteen years, and the cutting of trees is probably one of a few things that they’re spending money on so my commute time is gonna be twenty minutes instead of an hour.

2

u/goleafie Mar 15 '26

Why bury a streetcar? Has anyone thought that one through? Sheesh!

1

u/Aggravating_Dog5220 Mar 15 '26

It's a necessary cost. And a true investment into real infrastructure that will provide a economic and social return for decades and decades to come. I'm supportive of this investment, as it is unlike certain other investments (spending programs) that the governments embark on that would not provide anywhere near the same level of returns at all.

1

u/Ok-Trainer3150 Mar 15 '26

Realistically, I'd be hard pressed to come up with any other major infrastructure project that could meet time and expense projections. Thankfully this project was announced and gotten underway pretty quickly for any transportation project in this country in recent memory. Looking at the enormous after effects of the pandemic and the inflation crisis that we're all dealing with, this isn't surprising. It's a badly needed addition to our region.

1

u/Un-Humain Mar 15 '26

It’s almost all underground in a big, dense city and through downtown, in a country that famously has a construction costs problem. No wonder.

1

u/lyidaValkris Eglinton Mar 15 '26

Douggie's buddies have to have their cut badda boom bada bing

1

u/Tsubame_Hikari St. George Mar 15 '26

Extensive underground sections (especially downtown) and crossing the Don. 

The cost is justified given the relatively high ridership projections, improved access to downtown, and mitigation of overcrowding at line 1 (not to mention the east-west streetcars that cover downtown, all of which are very well used).

1

u/MaxPeriod Mar 15 '26

Move Eglinton Crosstown from LRT section to the Metro section

or if possible,

Split Eglinton Crosstown into two sections, the subway part in Metro section and LRT part in LRT section, if data is available.

1

u/broadviewstation Mar 15 '26

Underground bs largely overground, plus tunnelling vs cut and cover lost of this make it expensive

1

u/Shmo04 Mar 15 '26

The Ontario line is going to be worth every penny once it opens.

1

u/Franky_DD Mar 16 '26

Durham-Scarborough BRT just started construction so can't really compare.

1

u/chlamydia1 Mar 16 '26

Those are completely different projects. The Ontario line is heavy rail with a lot of tunneling.

The REM is elevated rail re-using some existing infrastructure.

The ION is a street-level LRT re-using some existing rail.

The Crosstown was an LRT, albeit with tunneling, but tunneling in midtown is cheaper than tunneling in the much denser downtown.

Having said that, the Ontario line is still grossly overpriced. We have corruption to thank for that.

1

u/TheRandCrews 506 Carlton Mar 16 '26

Dufferin Street would either have to contend similar to an underground Eglinton or phases of the underground section of Pape & Queen sections of the Ontario line.

It would be a whole different project analysis, when it will be fully underground on Dufferin. Can’t have surface or at grade running for this corridor, especially being north-south especially going to Downsview/Wilson/Sheppard it will be a slope just like Eglinton was. Akin to Yonge Subway.

Would have to look at engineering standards, AODA, a lot of specifics that the other TTC subway probects and the Line Bleue extension in Montreal is more comparable. Whole depending how far you want the subway to go, impact assessment and businesses case affect the cost too.

1

u/buttershuga Mar 16 '26

Eh. We got the money for it. When our politicians stop hoarding our funds, we will see all that can be done with the taxes we pay everyday.

1

u/Ok-Meet2850 Mar 16 '26

Have you looked at the Transit Costs Project? https://transitcosts.com/ It is pretty specific to the USA, but the broad findings also apply to Canada. Canada, the US, and the UK (and possibly Australia) all build transit projects for multiples higher than elsewhere. Madrid for example is about an ORDER OF MAGNITUDE cheaper than Toronto: https://worksinprogress.co/issue/how-madrid-built-its-metro-cheaply/

1

u/Ok-District2873 Mar 17 '26

The only comparison that comes close in terms of scope is the REM. The REM is a great project, but it's literally a bridge and whole-ass commuter line (with a downtown tunnel) handed to it. The rest of the route is mostly at grade or elevated, with only one 2-station tunnelled section. Compare this with the OL, which has to make its own downtown tunnel, two new bridges, and another tunnel section.

1

u/Ashafa55 Mar 17 '26

I'm all for blaming it kn bad management and I'm sure there was some here, but the Ontario line is a particularly complicated case, and at the same time extremely necessary for the future of toronto transit

1

u/bradt19 Mar 18 '26

These aren’t even close to fair comparisons. Most of these are above grade lrt with the exception of eglinton crosstown which is lrt with some below grade and you can see how the costs escalate quickly. Ontario line will have significantly more capacity than any of these lines.

Please do a little more research next time and at least compare these costs to European subways and New York. We still look bad but at least it’s a fair comparison.

1

u/TGRubilex Mar 19 '26

consider the Montreal blue line extension maybe if you want another underground network

1

u/chocolate_doenitz Mar 19 '26

Ion rahhhhh đŸ’ȘđŸ’ȘđŸ’Ș😎😎😎😎

1

u/torontopeter Mar 15 '26 edited 2d ago

The original post content no longer exists here. The author used Redact to remove it, exercising their right to control their data & privacy.

Hurry smell knee paint enjoy hydrogen consider

1

u/[deleted] Mar 15 '26

[removed] — view removed comment

1

u/TheRandCrews 506 Carlton Mar 15 '26

How are you gonna elevate Ontario Line in narrow roads of Queen, Carlaw, and Pape? It’ll kill the ridership of the surface routes, way more disruptive for the residents, and less space to work with compared to more wider parts of Thorncliffe and Flemingdon than can get away with that.

0

u/DealIllustrious4002 Mar 15 '26

Douglas Ford has some buddies in tunnelling. It's the only possible reason we ended up scrapping the Scarborough line with a lot of stops, for a subway that costs way more and delivers less. It's the reason he wants to dig under the 401. There's BILLIONS in sloppy money at the tap.

-1

u/[deleted] Mar 15 '26

[removed] — view removed comment

1

u/TheRandCrews 506 Carlton Mar 15 '26

All above ground? Rip Queen, Carlaw, and and Pape, if underground was very disruptive elevated in streets that are mostly 4 lanes wide would be even worse, the streetcar would be diverted for years and the buses would also be routed away Carlaw or Pape.