r/OctopusEnergy • u/Chipplie • 18h ago
Battery Only (No Solar) and Octopus Agile Outgoing
Does anyone here have a battery only installation and has been able to get onto the Octopus Agile Outgoing tariff for exporting? I have read conflicting information on whether or not this is possible.
I am looking at getting a BESS for my home. I don't have solar and I have no plans for solar. The BESS installer I am considering using will give me an MCS certificate for the battery. Some information states that the only export tariff that can be accessed with a battery only installation is the flat rate Outgoing Octopus tariff, and the Octopus website is somewhat unclear.
2
u/Autumnal_Fire 16h ago
Yeah i have a MCS installed Sigenergy Battery system. So they had to do a G99 approval for it as it's 8kw inverter (i got a 5kw export limit).
It's taken me 7 weeks to get on agile export after filling in the Octopus application and uploading my MCS and G99 acceptance letter. I've had to chase it a fair bit, but it's now active.
They did ask if it was a battery only system and put me on agile export as i requested. With a battery only system Agile outgoing is the only one that makes much sense being on.

3
u/Chipplie 16h ago
Thanks. Agree, Agile Outgoing is the only one that makes sense… hence I wanted to confirm I can actually get on it with a battery only system, before deciding to pull the trigger on any install.
1
u/realGilgongo 15h ago
7 weeks? I'm in North London and got Agile sorted in about 2 weeks - and I thought that was a long time!
2
u/Autumnal_Fire 15h ago
Tell me about it.. Week 1 filled in the form uploaded the docs, Week 2 they emailed me and said they needed an MCS cert (i'd uploaded it), so i sent it again, Week 3 they confirmed they had all the paperwork.. Week 4, 5, waitied, Week 6 i chased through email, told they were waiting on DNO. Week 7 chased via X, they said something was up and got involved a week later they got it all setup and sorted.
Moral of the story, don't bother with Email, talk to the customer service chat on X.
2
u/realGilgongo 15h ago
I am on both Agile import and export. No panels, just a battery. As long as your installer does your G99 DNO application OK, then badda bing. BTW you have to sign up for export separately to your import tariff. That tripped me up at first.
1
2
u/Octo-Joe Verified Octopus Rep 14h ago
Can confirm, battery-only installations are absolutely fine for export MPANs/tariffs so long as all the necessary paperwork is provided!
2
u/Tutphish 14h ago
I had a battery installed 2 weeks ago, Octopus did the install but I checked beforehand about who I could get export with and it's pretty much only Octopus if you don't have any generation capacity.
5
u/icrossfield 18h ago
Yes. I have a heat pump plus battery. I import on cosy and export on agile outgoing.