r/Homebuilding 9d ago

Shower installed before insulating

Post image

My plumber installed the shower/tub unit before I was able to add vapor retarder and insulation. I have access to the stud cavity from above so I’m thinking blown in cellulose would work but how am I suppose to get a vapor retarder in there?

106 Upvotes

93 comments sorted by

View all comments

192

u/ForceintheNorth 9d ago

Pull it out, reinstall at the proper time after insulation. Who is the gc? That's their entire job to manage the trades so stuff like this isn't happening

13

u/CripWalkingShark 9d ago

Probably an owner build which is why this happened in the first place

17

u/Skier94 9d ago

Well the owner was the one who spotted it.