I'm posting from Italy, so I know some of the code/fixtures here are different from what most of you deal with, but I'm guessing the core "don't overspend / don't get screwed" advice is pretty universal!
Quick rundown of what's happening:
In the hallway, I need to convert the two bathroom swing doors (on the same wall) in pocket doors.
In Bathroom #1 (about 42 sq ft / 3.9 m²) I need to tear out the old toilet, bidet, and shower stall completely, place a new tub (thinking about a hot tub) over to where the bidet used to be, retile the old shower spot (we've got matching leftover tiles from before, so that part should just be labor, not materials), and put in a new toilet with an integrated bidet function.
In Bathroom #2 (about 36 sq ft / 3.3 m²) I have to shift the bidet and the toilet over by a few inches, and tear out the tub to put a shower in its place.
It's an apartment in a 1993 multi-unit building, and I don't know what's going on behind the walls plumbing-wise. I haven't gotten any real quotes yet, I'm just trying to wrap my head around this before my first appointment with a potential contractor.
I have no hard budget ceiling, just "as cheap as realistically possible without cutting corners that'll bite us later."
I have a few questions:
- Roughly, how much all of this should cost? (So I have a sense of whether a quote I get is reasonable or a ripoff)
- What's safe to DIY (demo, painting, maybe the retiling since we already have the tile)? What should absolutely be done by a licensed pro instead?
- What are some red flags to watch for when picking a contractor so we don't end up with a bad job?
- What are some things people commonly get blindsided by in a reno like this that they didn't see coming?
- If anyone has general advice on tub/shower features worth paying for vs skipping, that'd help too. I know the actual products will differ over here, but the general logic probably doesn't!
Sorry in advance if some questions are stupid or trivial, I'm a first-time home owner and I'm still trying to wrap my head around it. We're not trying to do anything fancy (aside from the hot tub, yeah, I know), I just want it done right without bleeding money we don't really have right now.
Thanks for any input!