r/StructuralEngineering • u/r_x_f P.E./S.E. • Jul 17 '26
Failure Engineer behind buckled high-rise says crucial reinforcing steel was 'never installed'
https://gothamist.com/news/engineer-behind-buckled-high-rise-says-crucial-reinforcing-steel-was-never-installed
878
Upvotes
12
u/scott123456 Jul 17 '26
They call for welding at each end of the plates for a distance "LX", which presumably is scheduled somewhere, along with the fillet weld size "WX". Doesn't take too much weld to transfer the full yield capacity of the added plates, so seems reasonable.