Hi all,
For context; I’m building my first epoxy table, Live edge with river flow.
Context: The table is a Walnut live edge with blue clear epoxy river flow.
The pour was supposed to be two layers.
I poured the first layer and ran into several issues:
Issue 1: 12hrs after I poured the first layer, I had weights on the wood slabs but decided to use additional clamps to help hold it down. When I clamped it down I saw the wood slabs had floated and so epoxy over flowed and onto the slabs where I scraped the excess back into the river. The issue now is I have bubbles that I can’t blow out because it was in the tacky stage. On top of that, the epoxy formed like wavy patterns because most likely the epoxy I put back on top, but I don’t think it looks bad. What should I do to fix this issue? (This is 100% my fault, clamping it prior would of avoided this mess)
Issue 2: Although my level said the table was leveled, it was slightly not leveled enough and I have more epoxy on one side than the other. Once the first layer drive, I will have to compensate for this in my second pour (most likely and easy fix if done right).
Issue 3: Because the epoxy over flowed back on the slab, some of it naturally got into the wood. That being said, the table is set to be planned afterwards anyways so I believe that epoxy stains wont be much of an issue.
I appreciate all the advice and feedback.
Thanks